601

proposed reclamation at North Point on the Hong Kong side. I abandoned this idea on ascertaining that even if we surrendered to Blackhead as large a part of the North Point Reclamation area as we could safely part with, there would still be a balance of some $300,000 due on Kowloon Lots.

Subsequently, I ascertained that the owner was not prepared to consider any proposal for an exchange, that he declined to permit any sidings to be laid across his land or to negotiate for the sale of such portions of it as were required for that purpose. He is, however, prepared to dispose of the whole of the property, and it is understood that he will accept a sum of about $600,000 for it.

8. As stated above, the original estimate for the preliminary reclamation scheme was $585,000. The Chief Resident Engineer, in a letter to the Consulting Engineers of the 30th November, 1906, estimated the cost of 700 feet of wall, which would allow ocean steamers to come alongside the proposed extension of the reclamation, together with a godown suitable for such traffic, at £50,000. Mr. A. J. Barry, who went into this matter locally with Mr. Eves, is, I understand, proposing the adoption of a much cheaper section of wharf wall on the pattern

Edit History

2026-06-03 23:30:29 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
601 proposed reclamation at North Point on the Hong Kong side. I abandoned this idea on ascertaining that even if we surrendered to Blackhead as large a part of the North Point Reclamation area as we could safely part with, there would still be a balance of some $300,000 due on Kowloon Lots. Subsequently, I ascertained that the owner was not prepared to consider any proposal for an exchange, that he declined to permit any sidings to be laid across his land or to negotiate for the sale of such portions of it as were required for that purpose. He is, however, prepared to dispose of the whole of the property, and it is understood that he will accept a sum of about $600,000 for it. 8. As stated above, the original estimate for the preliminary reclamation scheme was $585,000. The Chief Resident Engineer, in a letter to the Consulting Engineers of the 30th November, 1906, estimated the cost of 700 feet of wall, which would allow ocean steamers to come alongside the proposed extension of the reclamation, together with a godown suitable for such traffic, at £50,000. Mr. A. J. Barry, who went into this matter locally with Mr. Eves, is, I understand, proposing the adoption of a much cheaper section of wharf wall on the pattern
Baseline (Original)
1 601 proposed reclamation at North Point on the Hongkeng side. I abandoned this idea on ascertaining that even if we sur- -rendered to Blackhead as large a part of the North Point Reclamation area as we could safely part with there would still be a balance of some $300,000 due on Kowloon Lots. يا سمير Subsequently I ascertained that the owner was not prepared to consider any proposal for an exchange, that he declined to permit any sidings to be laid across his land or to negotiate for the sale of such portions of it as were required for that purpose. He is however prepared to dis- -pose of the whole of the property and it is understood that he will accept a sum of about $600,000 for it. 8. As stated above the original estimate for the preliminary reclamation scheme was $585,000. The Chief Resident Engineer in a letter to the } } Consulting Engineers of the 30th. November, 1906, estimated the cost of 700 feet of wall which would allow Ocean Steamers to come alongside the proposed extension of the reclamation together with a Godown suitable for such traffic at £50,000. Mr. A. J. Barry who went into this mat- -ter locally with Mr. Eves is I understand proposing the adoption of a much cheaper section of wharf wall on the pattern
2026-06-03 23:30:29 · Baseline
View content

1

601

proposed reclamation at North Point on the Hongkeng side. I

abandoned this idea on ascertaining that even if we sur-

-rendered to Blackhead as large a part of the North Point

Reclamation area as we could safely part with there would

still be a balance of some $300,000 due on Kowloon Lots.

يا سمير

Subsequently I ascertained that the owner was not prepared

to consider any proposal for an exchange, that he declined

to permit any sidings to be laid across his land or to

negotiate for the sale of such portions of it as were

required for that purpose. He is however prepared to dis-

-pose of the whole of the property and it is understood

that he will accept a sum of about $600,000 for it.

8.

As stated above the original

estimate for the preliminary reclamation scheme was

$585,000. The Chief Resident Engineer in a letter to the

}

}

Consulting Engineers of the 30th. November, 1906, estimated

the cost of 700 feet of wall which would allow Ocean

Steamers to come alongside the proposed extension of the

reclamation together with a Godown suitable for such

traffic at £50,000. Mr. A. J. Barry who went into this mat-

-ter locally with Mr. Eves is I understand proposing the

adoption of a much cheaper section of wharf wall on the pattern